Article
Publication date: 9 May 2024

Saeed Reza Mohandes, Atul Kumar Singh, Abdulwahed Fazeli, Saeed Banihashemi, Mehrdad Arashpour, Clara Cheung, Obuks Ejohwomu and Tarek Zayed

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is…

Abstract

Purpose

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is still constrained. This study seeks to identify and examine the digital twin’s implementation barriers in construction building projects to augment operational performance and sustainability.

Design/methodology/approach

An iterative two-stage approach was adopted to explore the phenomena under investigation. General DT Implementation Barriers were first identified from extant literature and subsequently explored using primary questionnaire survey data from Hong Kong building industry professionals.

Findings

Survey results illustrated that Lack of methodologies and tools, Difficulty in ensuring a high level of performance in real-time communication, Impossibility of directly measuring all data relevant to the DT, need to share the DT among multiple application systems involving multiple stakeholders and Uncertainties in the quality and reliability of data are the main barriers for adopting digital twins' technology. Moreover, Ginni’s mean difference measure of dispersion showed that the stationary digital twin’s barriers adoption is needed to share the DT among multiple application systems involving multiple stakeholders.

Practical implications

The study’s findings offer valuable guidance to the construction industry. They help stakeholders adopt digital twins' technology, which, in turn, improves cost efficiency and sustainability. This adoption reduces project expenses and enhances environmental responsibility, providing companies a competitive edge in the industry.

Originality/value

This research rigorously explores barriers to Digital Twin (DT) implementation in the Hong Kong construction industry, employing a systematic approach that includes a comprehensive literature review, Ranking Analysis (RII) and Ginni’s coefficient of mean difference (GM). With a tailored focus on Hong Kong, the study aims to identify, analyze and provide novel insights into DT implementation challenges. Emphasizing practical relevance, the research bridges the gap between academic understanding and real-world application, offering actionable solutions for industry professionals, policymakers and researchers. This multifaceted contribution enhances the feasibility and success of DT implementation in construction projects within the Architecture, Engineering and Construction (AEC) sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 20 December 2022

Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli and Saeed Reza Mohandes

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction…

Abstract

Purpose

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction managers and practitioners to estimate the time of compound elements in building projects using the resource specification technique.

Design/methodology/approach

A 4D BIM estimation process was first developed by applying the resource specification and geometric information from the BIM model. A suite of OA including particle swarm optimization, ant colony, differential evolution and genetic algorithm were developed and compared in order to facilitate and automate the estimation process. The developed processes and porotypes were linked and integrated.

Findings

The OA-based automated 4D BIM estimation prototype was developed and validated through a real-life construction project. Different OAs were applied and compared, and the genetic algorithm was found as the best performing one. The prototype was successfully linked with BIM timeliner application. By using this approach, the start and finish dates of all object-based activities are developed, and the project completion time is automatically estimated.

Originality/value

Unlike conventional construction estimation methods which need various tools and are error prone and time-consuming, the developed method bypasses the existing time estimation tools and provides the integrated and automated process with BIM and machine learning algorithms. Furthermore, this approach integrates 4D BIM applications into construction design procedures, connected with OA automation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 December 2020

Abdulwahed Fazeli, Mohammad Saleh Dashti, Farzad Jalaei and Mostafa Khanzadi

Analyzing different scenarios at the design stage of construction projects has always been a challenging task. One of the main parameters that helps owners in making better…

2567

Abstract

Purpose

Analyzing different scenarios at the design stage of construction projects has always been a challenging task. One of the main parameters that helps owners in making better decisions in designing their buildings is to look after the cost perspective on different design scenarios. Thus, this study aims to propose a semi-automated BIM-based cost estimation approach that enables practitioners to estimate the cost of projects based on different design scenarios by an accurate and agile system.

Design/methodology/approach

This study proposes an integrated framework, through which the cost estimation standard of Iran (FehrestBaha) is linked to the materials quantity take-offs (QTO) from BIM models. The performance of the system is based on connecting the classification standards of UniFormat and MasterFormat to the cost estimation standard of FehrestBaha. A BIM-based extension in the Revit environment is developed to automate the cost estimation process.

Findings

To evaluate the efficiency of the proposed approach in cost estimation, it is implemented to estimate the cost of the architectural discipline in a real construction project. The results indicate that the proposed BIM-based approach estimated the cost of the architectural discipline with an acceptable level of accuracy.

Practical implications

The proposed approach could be used by practitioners to have an agile and accurate BIM-based cost estimation of different scenarios during design process. The semi-automated system considerably reduces the time of cost estimation in comparison to the traditional manual approaches, particularly in complex structures. Owners are able to easily trace changes in project cost according to any changes in components and materials of the BIM model. Furthermore, the proposed approach provides a practical roadmap for BIM-based cost estimation based on cost estimation standards in different countries.

Originality/value

Unlike the traditional manual cost estimation approaches, the proposed BIM-based approach is not highly dependent on the knowledge of experienced estimators, which therefore facilitates its implementation. Furthermore, automating both QTO process and the required calculations in this approach increases the accuracy of cost estimation while decreasing the probability of human errors or omission occurrence.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 May 2022

Aso Hajirasouli, Saeed Banihashemi, Rob Drogemuller, Abdulwahed Fazeli and Saeed Reza Mohandes

This study aims to present a comprehensive review, critical analysis and implications of the augmented reality (AR) application and implementation in the construction industry…

1725

Abstract

Purpose

This study aims to present a comprehensive review, critical analysis and implications of the augmented reality (AR) application and implementation in the construction industry arena and demonstrate the gaps along with the future research agenda.

Design/methodology/approach

The construction industry has been under pressure to improve its productivity, quality and sustainability. However, the conventional methods and technologies cannot respond to this industry's ever-growing demands while emerging and innovative technologies such as building information modelling, artificial intelligence (AI), virtual reality (VR) and AR have emerged and can be used to address this gap. AR application has been acknowledged as one of the most impactful technologies in the construction digitalization process. However, a comprehensive understanding of the AR application, its areas of effectiveness and overarching implications in a construction project life cycle remain vague. Therefore, this study uses an integration of systematic literature review and thematic analysis techniques to identify the phases of a construction project life cycle in which AR is the most effective, the current issues and problems of the conventional methods, the augmented parameters, the immediate effects of using AR on each phase and, eventually, the overall influence of AR on the entire project. Nvivo qualitative data analysis software was used to code, categorize and create themes from the collected data. The result of data analysis was used to develop four principal frameworks of the AR applications – design and constructability review session; construction operation; construction assembly; and maintenance and defect inspection and management – and the gap analysis along with the future research agenda.

Findings

The findings of this study indicated that the application of AR can be most effective in the following four stages of a project life cycle: design and constructability review session; construction operation; construction assembly; and site management and maintenance, including site management and defect inspection. The results also showed that the application of AR technology in the construction industry can align and address building industry objectives by various elements such as: reducing project costs through the application of digital technologies, saving time, meeting deadlines and reduction in project delays through integrated, live scheduling and increased safety and quality of the construction work and workers.

Research limitations/implications

One of the main limitations of this study was the lack of materials and resources on the downfalls and shortcomings of using immersive technologies, AR, in the construction project life cycle. In addition, most of the reviewed papers were focused on the experiments with simulations and in the lab environment, rather than real experiments in real construction sites and projects. This may cause limitations and inaccuracy of the collected and reported data.

Practical implications

The results of this study indicated that the application of AR technology in construction industry can align and address building industry objectives by various elements such as: reducing project costs through the application of digital technologies; saving time; meeting deadlines and reduction in project delays through integrated, live scheduling; and increased safety and quality of the construction work and workers.

Social implications

Application of AR in the various stages of a project life cycle can increase the safety and quality of the construction work and workers.

Originality/value

The reviewed literature indicated that substantial research and studies are yet to be done, to demonstrate the full capacity and impact of these emerging technologies in the field. The collected data and literature indicate that amongst the digital technologies, AR is one of the least researched topics in the field. Therefore, this study aims to examine the application of AR in construction projects’ life cycle to identify the stages and practices of a project life cycle where AR and its capabilities can be exploited and to identify the respective problems and issues of the conventional methods and the ways in which AR can address those shortcomings. Furthermore, this study focuses on identifying the overall outcome of AR applications in a construction project in terms of cost and time efficiency, process precision and safety.

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596