Search results

1 – 1 of 1
Article
Publication date: 1 February 2024

Abdulkabir Opeyemi Bello and Calistus Ayegba

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to…

Abstract

Purpose

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to investigate the adoption of BIM for post-construction in Nigeria. Specifically, it aims to investigate the barriers hindering BIM adoption, propose strategies to facilitate its integration into the post-construction phase and examine the relationship between the barriers and strategies towards adopting BIM for post-construction.

Design/methodology/approach

This study employs a quantitative approach to gather numerical data on BIM perceived barriers among International Facility Management Association (IFMA) members. The study also develops strategies from an extensive literature review and combines them with insights from preliminary investigation. The data were analysed using descriptive and inferential statistics.

Findings

The top perceived barriers among the professionals are lack of BIM awareness, software availability issues and difficulties using new technologies. Institute training/workshops on BIM software for the professionals in the organisation, including BIM software courses in various related professional exams, and encouraging adoption of BIM from the grassroots, such as higher institutions, emerge as the top strategies. The findings further show a significant relationship between the barriers and strategies, emphasising the recognition that understanding barriers prompts the active development and implementation of strategies.

Originality/value

This study holds originality in its examination of the relationship between the barriers and strategies associated with BIM adoption in Nigerian Architecture, Construction, Engineering and Operation.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 1 of 1