Article
Publication date: 13 March 2019

Sajani Jayasuriya, Guomin Zhang and Rebecca Jing Yang

Public private partnerships (PPPs) face challenges in implementation and operation, and need efforts to improve their performance. The purpose of this paper is to review the PPP…

1336

Abstract

Purpose

Public private partnerships (PPPs) face challenges in implementation and operation, and need efforts to improve their performance. The purpose of this paper is to review the PPP literature quantitatively and qualitatively, in order to establish challenge themes and set research directions.

Design/methodology/approach

More than 4,000 papers published between 2008 and 2017 were retrieved. From this collection, papers from five major international journals were selected to explore extant PPP research findings under six main PPP challenges including: challenges related to financial management, concession period and price determination, operational phase, risk management, PPP project procurement and stakeholder management (SM). Initially, the papers were categorised quantitatively into the identified challenges and subsequently the articles were qualitatively analysed and discussed.

Findings

Poor SM, the complexity of risk management models, project delivery time and cost overruns, inadequate consideration of whole life-cycle aspects and over-reliance on a Public Sector Comparator for evaluating PPPs are found to be the most commonly encountered issues. These all warrant more extensive attention and innovative solutions.

Practical implications

PPP projects have faced many challenges in practice and also existing research findings have limited application in practice. Challenges highlighted in this research can be a focus area in practice to improve the performance of PPPs.

Originality/value

No previous reviews have explored the challenges relating to PPP projects and how they can then addressed by further studies in the field. This review is intended to address that gap, and should help to shed light on further research directions to address the emerging challenges in PPP procurement.

Details

Built Environment Project and Asset Management, vol. 9 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 20 May 2024

Janappriya Jayawardana, Malindu Sandanayake, Supun Jayasinghe, Asela Kulatunga and Guomin Zhang

The present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated…

Abstract

Purpose

The present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated strategy framework to mitigate and overcome the obstacles.

Design/methodology/approach

The research process included a comprehensive literature review, a pilot study, a questionnaire survey for data collection, statistical analysis and a qualitative content analysis.

Findings

Ranking method revealed that all 23 barriers were significant. Top significant barriers include challenges in prefabricated component transportation, high capital investment costs and lack of awareness of the benefits of PFC among owners/developers. Factor analysis clustered six barrier categories (BCs) that fit the barrier factors, explaining 71.22% of the cumulative variance. Fuzzy synthetic evaluation revealed that all BCs significantly influence PFC adoption in Sri Lanka. Finally, the proposed mitigation strategies were mapped with barriers to complete the integrated framework.

Practical implications

The study outcomes are relevant to construction industry stakeholders of Sri Lanka, who are keen to enhance construction efficiencies. The implications can also benefit construction industry stakeholders and policymakers to formulate policies and regulations and identify mitigation solutions.

Originality/value

The study provides deeper insights into the challenges to adopting prefabrication in South Asian countries such as Sri Lanka. Furthermore, the integrated framework is a novel contribution that can be used to derive actions to mitigate barriers in developing economies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 July 2018

Rebecca Jing Yang, Sajani Jayasuriya, Chathuri Gunarathna, Mehrdad Arashpour, Xiaolong Xue and Guomin Zhang

The complicated nature of megaprojects requires appropriate analysis of multiple stakeholders to achieve project objectives and to accommodate stakeholder interests. During the…

2808

Abstract

Purpose

The complicated nature of megaprojects requires appropriate analysis of multiple stakeholders to achieve project objectives and to accommodate stakeholder interests. During the last two decades, many stakeholder theories and empirical studies have sprouted. Although previous studies have contributed to the development of stakeholder theory, it seems that these theoretical advances have not been fully adopted and acknowledged in practices, especially in megaprojects. The purpose of this paper is to explore the evolution of stakeholder analysis and engagement practices adopted in the Australian megaprojects over the last two decades.

Design/methodology/approach

Four mega construction projects are described and analysed in this study. Secondary data were first assembled in order to get general knowledge of each case. Interviews were conducted with the project directors. Project documents were collected from the project teams and reviewed. Wherever the project information was unclear, e-mails were sent to the directors and the team members to confirm the details.

Findings

Project teams have started to apply snowball rolling and stakeholder attribute assessment methods to analyse stakeholders. However, there is still a way to adopt the “network” analysis perspective because the project teams are reluctant to use complicated tools which need specialists’ assistance. The stakeholder engagement practices have evolved to an extent where the project teams monitor the dynamics of stakeholders’ requirements. Projects teams have identified the importance of continuity to manage stakeholders in these massive projects. However, a structured method selection mechanism for stakeholder engagement has not been developed.

Originality/value

This study will help academics to understand the adoption progress and status of stakeholder management methods.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 November 2019

Guanghua Li, Chuan Chen, Guomin Zhang and Igor Martek

Factors affecting bid/no-bid decisions of international projects are more complex than those of domestic projects. The purpose of this paper is to identify and rank decision…

Abstract

Purpose

Factors affecting bid/no-bid decisions of international projects are more complex than those of domestic projects. The purpose of this paper is to identify and rank decision factors considered by variously sized Chinese international contractors (CICs) and categorize those groups of factors important to experienced practitioners.

Design/methodology/approach

The analysis of factors identified by a literature review is conducted based on data derived from questionnaire results received from 119 CIC project and bidding managers. The relative importance of factors is measured by mean value and standard deviation. The discrepancy in rank and importance value perceived by variously sized CICs are explored by ranking disparity analysis, non-parametric test and Spearman’s rank correlation coefficient test. Finally, factor analysis is used to categorize the underlying groups of factors considered by CICs.

Findings

In sum, 41 factors are identified through the literature review as having an impact on the bid decision. Significant disparities in ranking and importance are found in several factors, which partially affect the consistency of the ranking of factors perceived between large and small-medium CICs. Ultimately, nine major factors are identified as impacting the bidding decision, with “contractor’s capability” and “country risk of the host country,” being the most important.

Research limitations/implications

The weight of a factor considered in a decision varies across contractors as a function of contractor size. Whether using models or subjective judgment in making decisions, it is beneficial to fully understand the main groups of factors influencing the decision. Vulnerability to country risk emerges as the first criterion accessed in the bid decision.

Originality/value

A comprehensive set of factors is established for CICs, including both general factors common to domestic projects, and international factors unique to international projects. All factors are grouped by inferential analysis from the perspective of contractors, which reveals the underlying mechanism of the bid decision-making process. While the data were collected from CICs, the methodology in exploring factors, along with implications, is determined to be applicable internationally.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 January 2017

Pushpitha Kalutara, Guomin Zhang, Sujeeva Setunge and Ron Wakefield

Australia has a huge stock of community buildings built up over decades. Their replacements consume a large sum of money from country’s economy which has called for a strategy for…

Abstract

Purpose

Australia has a huge stock of community buildings built up over decades. Their replacements consume a large sum of money from country’s economy which has called for a strategy for their sustainable management. For this, a comprehensive decision-making structure is an utmost requirement. The purpose of this paper is to capture their sustainable management from four aspects, i.e. environmental, economic, social and functional.

Design/methodology/approach

The design process follows an extensive review of environmental and life cycle assessments and company context documents. Extracted factors are tailored to community buildings management following expert consultation. However, the resulted list of factors is extremely large, and “factor analysis” technique is used to group the factors. For this, an industry-wide questionnaire across Australian local councils is employed to solicit opinions of the list of factors.

Findings

The analysis has pinpointed 18 key parameters (criteria) to represent all four aspects. This paper presents the preliminary findings of the factors and the analysis results based on the questionnaire responses.

Practical implications

The final decision-making structure incorporates all these aspects and criteria. This can be used to develop a decision-making model which produces a sustainability index for building components. Asset managers can mainly use the sustainability index to prioritise their maintenance activities and eventually, to find out cost-optimisation options for them.

Originality/value

Most notably, this is the first study to apply all four sustainability aspects (environmental, economic, social and functional) to develop a decision-making structure for Australian community buildings’ sustainable management.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 July 2012

Xiao‐Hua Jin, Guomin Zhang and Rebecca J. Yang

The purpose of this paper is to investigate and uncover key determinants that could explain partners' commitment to risk management in public‐private partnership projects so that…

2061

Abstract

Purpose

The purpose of this paper is to investigate and uncover key determinants that could explain partners' commitment to risk management in public‐private partnership projects so that partners' risk management commitment is taken into the consideration of optimal risk allocation strategies.

Design/methodology/approach

Based on an extensive literature review and an examination of the purchasing power parity (PPP) market, an industry‐wide questionnaire survey was conducted to collect the data for a confirmatory factor analysis. Necessary statistical tests are conducted to ensure the validity of the analysis results.

Findings

The factor analysis results show that the procedure of confirmatory factor analysis is statistically appropriate and satisfactory. As a result, partners' organizational commitment to risk management in public‐private partnerships can now be determined by a set of components, namely general attitude to a risk, perceived one's own ability to manage a risk, and the perceived reward for bearing a risk.

Practical implications

It is recommended, based on the empirical results shown in this paper, that, in addition to partners' risk management capability, decision‐makers, both from public and private sectors, should also seriously consider partners' risk management commitment. Both factors influence the formation of optimal risk allocation strategies, either by their individual or interacting effects. Future research may therefore explore how to form optimal risk allocation strategies by integrating organizational capability and commitment, the determinants and measurement of which have been established in this study.

Originality/value

This paper makes an original contribution to the general body of knowledge on risk allocation in large‐scale infrastructure projects in Australia adopting the procurement method of public‐private partnership. In particular, this paper has innovatively established a measurement model of organisational commitment to risk management, which is crucial to determining optimal risk allocation strategies and in turn achieving project success. The score coefficients of all obtained components can be used to construct components by linear combination so that commitment to risk management can be measured. Previous research has barely focused on this topic.

Details

Construction Innovation, vol. 12 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 September 2019

Guomin Wang, Yuanyuan Wu, Haifu Jiang, Yanjie Zhang, Jiarong Quan and Fuchuan Huang

The purpose of this paper is to use the wavelet neural network and genetic algorithm to study the effects of polyalphaolefin, TMP108 and OCP0016 on the kinematic viscosity…

Abstract

Purpose

The purpose of this paper is to use the wavelet neural network and genetic algorithm to study the effects of polyalphaolefin, TMP108 and OCP0016 on the kinematic viscosity, viscosity index and pour point of lubricating oil.

Design/methodology/approach

Wavelet neural network is used to train the known samples, test the unknown samples and compare the obtained results with those obtained with a traditional empirical formula.

Findings

It is found that the wavelet neural network prediction value is closer to the experimental value than the traditional empirical formula calculation value.

Originality/value

The results show that the wavelet neural network can be used to study the physical and chemical indexes of lubricating oil.

Details

Industrial Lubrication and Tribology, vol. 72 no. 1
Type: Research Article
ISSN: 0036-8792

Keywords

Book part
Publication date: 20 January 2021

Yao Lixia

Abstract

Details

Energy Security in Times of Economic Transition: Lessons from China
Type: Book
ISBN: 978-1-83982-465-4

Article
Publication date: 7 October 2014

Liguo Xu, Pinging Fu and Youmin Xi

The purpose of this paper is to conceptualize the indigenous concept of suzhi at individual and organizational levels, and identify its dimensions for human resource management…

Abstract

Purpose

The purpose of this paper is to conceptualize the indigenous concept of suzhi at individual and organizational levels, and identify its dimensions for human resource management (HRM) research and practice in China.

Design/methodology/approach

Based on a comprehensive review of suzhi literature, Chinese cultural and historical literature, as well as Western mainstream HRM research, a multidimensional suzhi framework is conceptualized.

Findings

As an indigenous expression, suzhi can be and has been adopted for Chinese HRM research and practice. As a multidimensional construct, one’s cognitive suzhi is jointly determined by corresponding moral suzhi, wenhua (knowledge-based) suzhi and zhuanye (professional) suzhi. Cognitive suzhi, in turn, determines one’s behavioral suzhi that drives employees to enhance organizational performance, and this relationship is moderated by psychological suzhi.

Research limitations/implications

The proposed framework provides new insight for Chinese indigenous management research, particularly in developing suzhi measurement for different dimensions. It also informs HRM practices in recruiting, selection, performance analysis and employee career development.

Originality/value

The complexity of suzhi dimensions from an organizational HRM perspective is analyzed. The resulting suzhi framework offers new insight for HRM research and practices in China.

Details

Journal of Chinese Human Resource Management, vol. 5 no. 2
Type: Research Article
ISSN: 2040-8005

Keywords

Article
Publication date: 7 October 2014

Greg G. Wang, David Lamond, Verner Worm, Wenshu Gao and Shengbin Yang

The purpose of this paper is to examine the indigenous Chinese concept of suzhi (素质) with the aim of furthering the development of Chinese human resource management (HRM) research…

Abstract

Purpose

The purpose of this paper is to examine the indigenous Chinese concept of suzhi (素质) with the aim of furthering the development of Chinese human resource management (HRM) research and practice.

Design/methodology/approach

An extensive review of the literature on suzhi, published in the West, as well as in China, is the basis for proffering an organizational-level conceptualization of suzhi in the Chinese context.

Findings

Instead of understanding it as a free-floating signifier, we argue that suzhi can be considered as a criterion-based framework for HRM research and practice. Suzhi research is classified into two major sources – indigenous Chinese and indigenized Western constructs. We further make a distinction between intrinsic and extrinsic suzhi, and analyze a popular set of suzhi criteria, considering de (morality) and cai (talent), while focusing on de in HRM selection (德才兼备, 以德为先). As multilevel and multidimensional framework, suzhi criteria may form different gestalts in different organizations and industries.

Research limitations/implications

From a social cultural and historical perspective, HRM research that incorporates a combination of indigenous and indigenized suzhi characteristics may receive better acceptance by individuals, organizations and the society in the Chinese context. Accordingly, the reconstruction of suzhi into manageable and measurable dimensions can be undertaken for more effective HRM practice in the Chinese context.

Originality/value

The HRM literature is advanced by linking the indigenous suzhi discourse to Chinese indigenous HRM research and practice.

Details

Journal of Chinese Human Resource Management, vol. 5 no. 2
Type: Research Article
ISSN: 2040-8005

Keywords

1 – 10 of 26