Search results

1 – 1 of 1
Article
Publication date: 1 September 2019

Jinao Chen, Aming Lu and Feng Zhai

In order to ensure the high-quality completion of the construction of stadiums and gymnasiums and the smooth holding of the Fourteenth National Games, through on-the-spot…

677

Abstract

In order to ensure the high-quality completion of the construction of stadiums and gymnasiums and the smooth holding of the Fourteenth National Games, through on-the-spot investigation and collation of relevant literature at home and abroad, lessons are drawn from the experience of the planning and construction of the stadiums and gymnasiums of the recent three National Games. According to the investigation of the stadiums and gymnasiums in Shaanxi Province, the number, characteristics, overall layout and construction methods of the required stadiums are specifically analyzed. Taking Xi'an Sports Center as an example, from the point of view of the construction requirements of the main stadium of the National Games and the sports construction technology, the functional orientation and construction standards of the competition facilities and training base facilities are put forward. Especially for the planning and design of sports construction facilities including “one stadium, two gymnasiums”, Tennis Center and outdoor sports stadium, the specific index analysis is made. The index analysis provides suggestions for the compilation of the planning and design task sheet of Xi'an Sports Center, and provides reference for the planning and construction of other stadiums and gymnasiums for the Fourteenth National Games.

Details

Open House International, vol. 44 no. 3
Type: Research Article
ISSN: 0168-2601

Keywords

1 – 1 of 1