Article
Publication date: 18 August 2022

Lovelin Ifeoma Obi, Temitope Omotayo, Damilola Ekundayo and Abiodun Kolawole Oyetunji

Building information modelling (BIM) is an innovative, collaborative process underpinned by digital technologies introduced to improve project performance in the architecture…

Abstract

Purpose

Building information modelling (BIM) is an innovative, collaborative process underpinned by digital technologies introduced to improve project performance in the architecture, engineering and construction (AEC). Growth in industry demands has necessitated BIM inclusion into the higher education (HE) curricula as both a pedagogic and practical objective to prepare and develop aspiring built environment (BE) professionals with the required competence for contemporary practice. However, comprehension of BIM concepts and subsequent development of the skill set required for its application remains overwhelming for students. In mitigating this challenge, adopting appropriate learner-centred strategies has been advocated. Problem-based learning (PBL) is becoming a widespread strategy to address concerns associated with authentic practices.

Design/methodology/approach

This paper evaluates the impact of the PBL strategy on students' accelerated learning of BIM based on a case study of 53 undergraduate students in a BIM module. The network analysis and centrality measures were employed in understudying the most applicable BIM skills.

Findings

From the analyses, PBL benefits students' knowledge acquisition (cognitive and affective) of BIM concept and development of transferable skills (academic and disciplinary), equipping them with capabilities to become BIM competent and workplace ready for the AEC industry.

Originality/value

The BIM pedagogy evolves, and new skillsets emerge. Analytical, communications and collaboration skills remain sacrosanct to delivering BIM modules. These skills mentioned above are essential in getting undergraduate students ready to apply BIM in the AEC sector.

Details

Smart and Sustainable Built Environment, vol. 13 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 January 2021

Lovelin Ifeoma Obi, Mohammed Arif, Bankole Awuzie, Rubina Islam, Aman Deep Gupta and Robert Walton

Effective cost performance is a crucial criterion measuring successful project management in public-housing projects. This paper aims to analyse the vital underlying factors…

1253

Abstract

Purpose

Effective cost performance is a crucial criterion measuring successful project management in public-housing projects. This paper aims to analyse the vital underlying factors surrounding the successful cost management process (CMP) outcomes in public housing projects (PHPs).

Design/methodology/approach

The research was conducted in three stages. The first stage consisted of a detailed literature review to document success factors affecting cost performances and management. In stage two, brainstorming sessions were undertaken with construction experts knowledgeable in cost management practices and have been involved in PHPs. These sessions were used to refine those success factors for the PHPs settings and define their criticality with respect to the CMP stages using interpretive ranking process. In stage three, focus group sessions were performed to validate the interrelationships of the contextualised critical success factors.

Findings

The top three most critical factors for successful implementation and outcomes at all CMP stages in PHPs settings were found to relate to competencies, team qualities and collaborative practices of the project team. Early contractor involvement and effective construction planning and management also emerged relevant to the process.

Practical implications

Government project departments, project managers and construction organisations (consultants and contractors) need to commit and mandate continuous development of cost management competencies for all professionals engaged in PHPs. Channels supporting team integration and collaborative practices between design and construction teams are required to increase the likelihood of successful project cost management practice and outcomes in PHPs.

Originality/value

The research has developed a factor-process relationship model that can be used to improve and evaluate the efficacy of CMP implementation in PHP settings.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 October 2023

Lovelin Ifeoma Obi, Mohammed Arif, Steve Michael Lamb and Ilnaz Ashayeri

The United Kingdom (UK) construction sector is transforming with increasing confidence in offsite construction (OSC) solutions following its accrued benefits. To sustain this…

Abstract

Purpose

The United Kingdom (UK) construction sector is transforming with increasing confidence in offsite construction (OSC) solutions following its accrued benefits. To sustain this momentum, exploring viable strategies to promote successful OSC implementation is a top priority. This paper aims to identify and establish interrelationships and logical dependencies of critical success factors (CSFs) for implementing OSC on building projects in the UK.

Design/methodology/approach

This study utilised a qualitative research approach. Following a critical review of extant literature, brainstorming and focus group sessions were carried out with OSC experts in the UK construction industry to identify and contextualise CSFs for OSC implementation. Interpretive structural modelling (ISM) and matrix impact cross-reference multiplication applied to a classification (MICMAC) were used to analyse and model the interrelationships between the contextualised CSFs.

Findings

The study identified eighteen CSFs for implementing OSC on projects in the UK positioned on seven hierarchical levels and clustered into dependent, linkage and independent factors. The top five CSFs established were client commitment, top management support, adequate OSC knowledge and experience, flexible leadership and flexible business models. These were located at the base of the ISM model, possessing the highest driving powers in facilitating the successful implementation of OSC on projects.

Originality/value

This study established a hierarchical interrelationship and the importance of the CSFs influencing the successful implementation of OSC. This would assist OSC clients and project teams in identifying and prioritising particular areas for strategic actions, which offer advantages in pursuing successful OSC project outcomes in the UK. Previous research on OSC implementation in the UK had not examined CSFs' interrelationships.

Article
Publication date: 7 August 2017

Lovelin Ifeoma Obi, Mohammed Arif and Dennis J. Kulonda

This study aims to develop a success factor model to understand and facilitate improved cost management system (CMS) implementation in low-cost housing (LcH) project delivery in…

Abstract

Purpose

This study aims to develop a success factor model to understand and facilitate improved cost management system (CMS) implementation in low-cost housing (LcH) project delivery in Nigeria.

Design/methodology/approach

Literature findings highlight 13 drivers affecting effective implementation within the CMS and uses series of brainstorming sessions and questionnaire surveys to validate the drivers. Factor analysis (FA) identifies possible contextual relationships among the validated drivers and groups them into three success factors. The results of the FA are refined using interpretive structural modelling (ISM). The ISM identifies and models the influential drivers and aids the development of the success factor model.

Findings

Effective team qualities, information and management actions and a stable operational environment are the three essential success factors for effective CMS implementation.

Practical implications

The paper highlights effective team qualities as the most important CMS considerations for Nigerian LcH project delivery. This finding creates the needed awareness to guide project sponsors and project managers in the appropriate selection of the project management team (PMT) as well as the procurement system that facilitates their collaboration.

Originality/value

This study is a novel research using FA and ISM to investigate the influence of success factors needful for effective implementation within the CMS. It further develops a hierarchy model that aids the PMT with better understanding of the drivers and factors interrelationships for use on LcH projects within the Nigerian context.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 18 August 2020

Oluyomi A. Osobajo, Adekunle Oke, Temitope Omotayo and Lovelin Ifeoma Obi

While circular economy (CE) is fast becoming a political and economic agenda for global urban development, there are still substantial knowledge gaps in possible strategies to…

1957

Abstract

Purpose

While circular economy (CE) is fast becoming a political and economic agenda for global urban development, there are still substantial knowledge gaps in possible strategies to speed up such transition, especially in the construction industry. This study analyses literature surrounding CE to unpack current trends possible future research directions to foster CE implementation in the construction industry.

Design/methodology/approach

The study undertakes a systematic review of CE literature published between 1990 and 2019. It adopts a five-stage procedure as a methodological approach for the review: formulation of the research question(s), locating and identifying relevant studies, selection and evaluation of studies, analysis or synthesis and results reporting.

Findings

The findings on CE research in the construction industry show extensive focus on resource use and waste management. There are limited investigations in other areas of construction such as supply chain integration, building designs, policy, energy efficiency, land use, offsite manufacturing, whole life costing, and risk, cost reduction, cost management, health and safety management. The study findings provide evidence that current CE practice fails to incorporate other areas that would facilitate the network of true circular construction industry.

Originality/value

This research provides a comprehensive overview of research efforts on CE in the construction context, identifying areas of extensive and limited coverage over three decades. Besides, it identifies possible pathways for future research directions on CE implementation, towards the accelerated transition to a true circular construction industry for the benefit of funding bodies and researchers.

Details

Smart and Sustainable Built Environment, vol. 11 no. 1
Type: Research Article
ISSN: 2046-6099