Search results

1 – 5 of 5
Article
Publication date: 26 January 2024

Mohsen Rajabzadeh, Seyed Meysam Mousavi and Farzad Azimi

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers…

Abstract

Purpose

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers. By deducting the costs associated with each policy from its revenue, this study aims to maximize the profit from managing unsold goods.

Design/methodology/approach

A new mixed-integer linear programming model has been developed to address the problem, which considers the selling prices of products in primary and secondary stores and the costs of transportation, cross-docking and returning unwanted items. As a result of uncertain nature of the cost and time parameters, gray numbers are used to deal with it. In addition, an innovative uncertain solution approach for gray programming problems is presented that considers objective function satisfaction level as an indicator of optimism.

Findings

According to the results, higher costs, including transportation, cross-docking and return costs, make sending goods to outlet centers unprofitable and more goods are disposed of in primary stores. Prices in primary and secondary stores heavily influence the number of discarded goods. Higher prices in primary stores result in more disposed of goods, while higher prices in secondary stores result in fewer. As a result of the proposed method, the objective function satisfaction level can be viewed as a measure of optimism.

Originality/value

An integral contribution of this study is developing a new mixed-integer linear programming model for selecting the appropriate goods for re-commercialization and choosing the best outlet center based on the products' price and total profit. Another novelty of the proposed model is considering the matching percentage of boxes with secondary stores’ desired product lists and the probability of returning goods due to non-compliance with delivery dates. Moreover, a new uncertain solution approach is developed to solve mathematical programming problems with gray parameters.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 6 July 2022

Pouyan Mahdavi-Roshan and Seyed Meysam Mousavi

Most projects are facing delays, and accelerating the pace of project progress is a necessity. Project managers are responsible for completing the project on time with minimum…

Abstract

Purpose

Most projects are facing delays, and accelerating the pace of project progress is a necessity. Project managers are responsible for completing the project on time with minimum cost and with maximum quality. This study provides a trade-off between time, cost, and quality objectives to optimize project scheduling.

Design/methodology/approach

The current paper presents a new resource-constrained multi-mode time–cost–quality trade-off project scheduling model with lags under finish-to-start relations. To be more realistic, crashing and overlapping techniques are utilized. To handle uncertainty, which is a source of project complexity, interval-valued fuzzy sets are adopted on several parameters. In addition, a new hybrid solution approach is developed to cope with interval-valued fuzzy mathematical model that is based on different alpha-levels and compensatory methods. To find the compatible solution among conflicting objectives, an arithmetical average method is provided as a compensatory approach.

Findings

The interval-valued fuzzy sets approach proposed in this paper is denoted to be scalable, efficient, generalizable and practical in project environments. The results demonstrated that the crashing and overlapping techniques improve time–cost–quality trade-off project scheduling model. Also, interval-valued fuzzy sets can properly manage expressions of the uncertainty of projects which are realistic and practical. The proposed mathematical model is validated by solving a medium-sized dataset an adopted case study. In addition, with a sensitivity analysis approach, the solutions are compared and the model performance is confirmed.

Originality/value

This paper introduces a new continuous-based, resource-constrained, and multi-mode model with crashing and overlapping techniques simultaneously. In addition, a new hybrid compensatory solution approach is extended based on different alpha-levels to handle interval-valued fuzzy multi-objective mathematical model of project scheduling with influential uncertain parameters.

Details

Kybernetes, vol. 52 no. 10
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 2 April 2020

Vahid Mohagheghi, Seyed Meysam Mousavi, Mohammad Mojtahedi and Sidney Newton

Project selection is a critical decision for any organization seeking to commission a large-scale construction project. Project selection is a complex multi-criteria…

Abstract

Purpose

Project selection is a critical decision for any organization seeking to commission a large-scale construction project. Project selection is a complex multi-criteria decision-making problem with significant uncertainty and high risks. Fuzzy set theory has been used to address various aspects of project uncertainty, but with key practical limitations. This study aims to develop and apply a novel Pythagorean fuzzy sets (PFSs) approach that overcomes these key limitations.

Design/methodology/approach

The study is particular to complex project selection in the context of increasing interest in resilience as a key project selection criterion. Project resilience is proposed and considered in the specific situation of a large-scale construction project selection case study. The case study develops and applies a PFS approach to manage project uncertainty. The case study is presented to demonstrate how PFS is applied to a practical problem of realistic complexity. Working through the case study highlights some of the key benefits of the PFS approach for practicing project managers and decision-makers in general.

Findings

The PFSs approach proposed in this study is shown to be scalable, efficient, generalizable and practical. The results confirm that the inclusion of last aggregation and last defuzzification avoids the potentially critical information loss and relative lack of transparency. Most especially, the developed PFS is able to accommodate and manage domain expert expressions of uncertainty that are realistic and practical.

Originality/value

The main novelty of this study is to address project resilience in the form of multi-criteria evaluation and decision-making under PFS uncertainty. The approach is defined mathematically and presented as a six-step approach to decision-making. The PFS approach is given to allow multiple domain experts to focus more clearly on accurate expressions of their agreement and disagreement. PFS is shown to be an important new direction in practical multi-criteria decision-making methods for the project management practitioner.

Article
Publication date: 17 March 2021

Samaneh Zolfaghari and Seyed Meysam Mousavi

The healthcare system is regarded as one of the most critical service industries. The surgical unit is the heart of hospitals in that any failures directly affect the safety of…

Abstract

Purpose

The healthcare system is regarded as one of the most critical service industries. The surgical unit is the heart of hospitals in that any failures directly affect the safety of patients, so they should be managed thoroughly. It is an intricate multi-attributes decision-making problem with uncertainty. Uncertain information in the form of fuzzy sets theory has been applied widely to describe the different aspects of system uncertainty. This study aims to present a new methodology to manage the healthcare system failures due to the multi-attributes decision-making process.

Design/methodology/approach

This study introduces a new risk evaluation methodology by failure mode and effect analysis (FMEA) and MULTIMOORA method. Group decision-making process in this methodology is presented under uncertain information in the form of interval-valued hesitant fuzzy linguistic sets (IVHFLSs). IVHFLSs encompass both qualitative and quantitative interpretation of experts to reflect their preferences, as well the ability and flexibility of derivation of linguistic information by several linguistic terms increase. To avoid the different ranking order of MULTIMOORA approaches, a new interval multi-approaches multi-attribute methodology, namely, technique of precise order preference (TPOP), is extended to provide precise ranking order.

Findings

The application and precision of proposed integrated IVHFL-MULTIMOORA methodology with TPOP is examined in a case study of healthcare systems. The results indicate the superiority of proposed methodology to prioritize and assess the failures as well as handling system uncertainty.

Originality/value

This study addresses the challenges of an organization to prioritize potential failures by implementing FMEA method. Moreover, this paper contributes to making the manager's ability in decision-making. The value of this study can be discussed in two aspects. First and foremost, this study provides a new FMEA-based methodology to rank failures precisely. The results prove that the proposed methodology is more robust to changes of different ranking order methods, applied by FMEA. On the other hand, using the capability of IVHFLSs allows collecting accurate information in an ambiguous and uncertain environment.

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

1 – 5 of 5